Pipework – Cambridge

Check out the neat work on this Geberit Mapress job the CG Systems team carried out in Cambridge; this installation feeds a Heat Recovery System providing hot water for the on site kitchens:

Cambridge pipework install

If you’d like further information on our involvement in this project, feel free to contact the CG Systems team on info@cgsystems.cc.

Plumbing Work

Previously an office block that has been stripped back completely to be converted to a number of residential dwellings, the team at CG Systems spent a week onsite in Watford fixing the communal heating and cold water main. Check it out…

office block heating

communal heating pipework

If you’d like further information on our involvement in this project, feel free to contact the CG Systems team on info@cgsystems.cc.

Pipework – National Retailer

Working onsite in Victoria for a national retailer, the team at CG Systems was responsible for piping three floors of Fan Coils, which we achieved by forming a supplementary plant room on the top floor to provide hydraulic separation from the existing landlord’s supply on the Heating and Chilled systems.

This was certainly one of the more challenging products (with regard to time pressure) we’ve completed but our Engineers have moved along at a phenomenal pace and kept within the allocated schedule, even finishing early on one of the floors. Have a look at the results…

Plant room pipework

Heating pipework

Victoria warehouse pipework

If you’d like further information on our involvement in this project, feel free to contact the CG Systems team on info@cgsystems.cc.

Aldi RDC – Isle of Sheppey

CG Systems secured the pipework installation contract on the new Aldi Regional Distribution Centre (RDC) in June 2017. The new £50m RDC has created around 400 new jobs and measures more than 40,000 square foot. Have a look at the below pics for an idea of the scale of the project:

Aldi warehouse pipeworking

Aldi pipework install

Our scope of work included:

  • 136no Fan coil units on a 4 pipe system
  • all the LTHW & CHW pipework on this system which was Geberit stainless steel mapress
  • 3no Plant rooms incorporating the 2no Viessmann boilers
  • 2no Beta Echos chillers and 2no Barkell air handling units
  • Over 500meters of welded gas pipe serving 9no Reznor warm air unit heaters
  • 2no Vaillant air source heat pumps
  • 1no GRP water tank and pumps.

All of the Domestic water services pipework was installed in Geberit Copper Mapress with all the valves on the project manufactured by Crane.

Heating in Aldi

RDC heating pipework

Once again we received fantastic support from our suppliers and the engineers involved in the project proved why they are an invaluable part of our team.

We recently achieved Prime Cost (PC) on this project, which makes it the longest running and largest project we have carried out to date.

Pipework installation at Aldi

Warehouse plantroom pipework

Heating installed pipework

Warehouse pipework install

If you’d like further information on our involvement in this project, feel free to contact the CG Systems team on info@cgsystems.cc.